MANAGED IT OPERATIONS · LATIN AMERICA · SINCE 2012
Checklist · Mexico

IT readiness for a nearshoring plant: 40-point checklist.

Use this list with your project team to make sure IT is not the reason production starts late — from fiscal and site access to network, devices, security and go-live.

Manufacturing plant and warehouse connected to the network
How to use itReview it 12 weeks before go-live, assign an owner to every item and revisit it weekly. Connectivity and site access usually have the longest lead times.

Fiscal & legal

  1. Company set-up and tax ID (RFC) ready for contracts and invoices
  2. Electronic invoicing (CFDI) process agreed with suppliers
  3. Import plan: pedimento, customs broker and, if applicable, IMMEX programme
  4. Telecom equipment certification checked for every model with radio functions
  5. Electrical safety compliance (NOM) for imported equipment
  6. Specialised services contractors registered as required by Mexican law
  7. Data protection notice for employees and visitors

Site access & safety

  1. Contractor registration and documents for site entry
  2. Safety induction scheduled for every engineer
  3. PPE requirements defined per area
  4. Badge and access-control process for IT contractors
  5. Work permits for cabling at height or in production areas

Connectivity

  1. Two carriers ordered — last-mile lead times can be long in new industrial parks
  2. Temporary connectivity for construction and commissioning
  3. WAN / SD-WAN design agreed with headquarters
  4. Public IP, VPN and remote access requirements
  5. Carrier escalation contacts documented

Network & Wi-Fi

  1. Structured cabling designed, installed and certified
  2. Wi-Fi survey of offices, warehouse and plant floor
  3. Industrial switches and enclosures where needed
  4. Network segmentation between office IT and OT
  5. Comms rooms with power, cooling and UPS
  6. As-built documentation and port maps

Devices

  1. Office laptops and desktops staged to your standard
  2. Shop-floor terminals and MES workstations
  3. Rugged handhelds and scanners for the warehouse
  4. Label and document printers with consumables
  5. Spare pool on site for critical devices
  6. Asset tags and inventory in the management platform

Security

  1. Identity, MFA and conditional access for new users
  2. Endpoint protection and patching enabled
  3. Backup for local servers and critical data
  4. CCTV and access control network ready
  5. Incident contacts and escalation agreed

Go-live & support

  1. Runbooks for common incidents
  2. Hypercare plan with engineers on site during ramp-up
  3. Service desk in Spanish and English
  4. SLA and preventive maintenance schedule
  5. Monthly reporting to headquarters
  6. Handover from project team to run team

40 items. This checklist is general guidance; confirm legal and fiscal requirements with your advisors.

Free PDF

Download the PDF: Nearshoring IT checklist: Mexico

A printable, branded version to share with your project team. With owner and due-date columns for every item.

  • Print-ready
  • Link also sent to your inbox
  • Free, no commitment

We use your details only to reply to this request. Privacy policy.

PDF

Your PDF is ready.

Click to download. We also sent the link to your inbox.

FAQ

Frequently asked questions

Can’t find your question? Talk to a solutions lead.

Can INconnet run this checklist with us?

Yes — it is the starting point of our readiness review for new plants in Mexico.

When should IT start on a new plant?

At least 12 weeks before go-live; connectivity often needs more.

Talk to a solutions lead

Tell us what you’re planning. We’ll reply within 1 business hour.

  1. 01A solutions lead — not a call center — gets back to you.
  2. 02A 20-minute call to understand your sites and timeline.
  3. 03A coverage map and priced proposal within 3 business days.
Step 1 of 2
What are you planning?

Next: countries and number of sites. Takes under a minute.

We use your details only to reply to this request. Privacy policy.

Received

Thank you — a solutions lead will reply within 1 business hour.

Want to move faster? Pick a time for a 20-minute call and we will come prepared with a first coverage view for your countries.

Get an assessment Book a call